Table of Contents:
Chennai, the capital city of Tamil Nadu, is a bustling metropolis that seamlessly blends tradition with modernity. In this vibrant city, where history and innovation coexist, the Chennai Metro Rail Limited (CMRL) has been making significant strides in revolutionizing urban transportation with Blue Line Metro Chennai.
Chennai Metro Blue Line has become an integral part of the city's daily life. Today in our blog, you will get insights about the key elements of the operational Blue Line Chennai Metro.
Blue Line Metro Chennai covers a distance of 44 Km, and it is part of phase 1 of the Chennai Metro project. It runs at a maximum speed of 80km/hr and is known for its technologically advanced features.
The Blue Line Chennai Metro is a rapid transit rail system, with the Wimco Nagar Depot being the first stop and the Chennai Airport being the last station on the Metro Blue Line Chennai.
The Chennai Metro Blue Line, which began its operations in 2016, has 26 metro stations on its route. Out of 26 stations on the Metro Blue Line Chennai, 13 stations are underground, and 13 stations are elevated.
The below table introduces you to the stations covered on the Blue Line Metro Station route:
Wimco Nagar Depot | LIC |
Wimco Nagar | Government Estate |
Tiruvottriyur | Thousand Lights |
Tiruvottriyur Theradi | Teynampet |
Toll Gate | AG DMS |
Kaladipet | Nandanam |
New Washermanpet | Saidapet |
Tondiarpet | Little Mount |
Sir Theagaraya College | Guindy |
Washermanpet | Arignar Anna Alandur |
Mannadi | Meenambakkam |
High Court | Nanganallur Road |
MGR Central (Chennai Central) | Chennai International Airport |
Source: Chennaimetrorail
The below image gives you insights into the Blue Line Metro Station route.
Interesting Read: Bangalore Mysore Expressway: Distance, Map, Route & Toll Rates
The commencement of the Blue Line Metro Chennai extension is initiated at Wimco Nagar metro station. This extension spans a length of 9.05 kilometers, introducing an additional 7 metro stations to the current list of 26 stations on the Blue Line Metro Chennai. The expansion project was undertaken by the Chennai Metro Rail Limited (CMRL) through a collaborative effort between the Government of India and the Tamil Nadu government.
Chennai's roads often bear the brunt of heavy congestion, especially during rush hours. The introduction of the Chennai Metro system has significantly reduced the burden on the road network and made daily commutes faster and more efficient.
The operating hours of the Metro Blue Line Chennai are 04:30 am to 11:00 pm. The frequency of the Blue Line metro remains 4-5 minutes during peak hours and 15 minutes during lean hours.
Blue Line Chennai Metro has made daily commutes faster and more efficient at affordable rates. Rs 10 is the minimum fare, while Rs. 50 is the maximum fare. The fare depends upon the distance traveled by the passenger.
The introduction of the Chennai Metro Blue Line has had a significant economic impact on Chennai. It has not only generated thousands of jobs during its construction but has also boosted the local economy.
Businesses along the metro route have witnessed increased footfall, and property values have appreciated in proximity to metro stations. The improved connectivity has also attracted new investments and businesses to the city, contributing to its overall growth.
Interesting Read: 7 Reasons to Buy Property in Chennai
The Blue Line Metro Chennai is more than just a mode of transportation; it's a symbol of progress and development. Over the past decade, it has become an indispensable part of the city's infrastructure, enhancing connectivity, reducing pollution, and boosting the economy. As Chennai continues to evolve, the Blue Line Metro will undoubtedly play a pivotal role in shaping its future. It stands as a shining example of how modern engineering can transform a city and improve the lives of its residents.
Recent Articles
View All